DPS Prep Academy Boiler Replacement

We provided mechanical and electrical engineering for the replacement of the 840 MBH cast iron sectional boiler installed in 1979 with (1) new high efficiency condensing boiler.

Scope

Mechanical Engineering

Location
2727 Columbine St, Denver, CO 80205
Affected Area
Building Heating Water System (31,000 Sqft)
Construction Cost
$400,000
Building Details
Our Services

Columbine Engineering was the Prime Consultant working under US Engineering for this Design-Build project. We provided mechanical and electrical engineering for the replacement of the 840 MBH cast iron sectional boiler installed in 1979 with (1) new high efficiency condensing boiler. A new control system will be added for this project, as well as the replacement of system accessories including air separator, expansion tank, filter feeder, etc… are also part of this project.