We provided mechanical and electrical engineering for the replacement of the 5,200 MBH firetube boiler installed in 1960 with (2) new high efficiency condensing boilers, providing heating system redundancy.
Mechanical Engineering
Columbine Engineering was the Prime Consultant working under US Engineering for this Design-Build project. We provided mechanical and electrical engineering for the replacement of the 5,200 MBH firetube boiler installed in 1960 with (2) new high efficiency condensing boilers, providing heating system redundancy. An upgrade to the control system and replacement of system accessories including air separator, expansion tank, filter feeder, etc… are also part of this project.
Reach out to us to discuss your project scope and needs.